CareGo The Innovators
Bundles of tube and pipe staged inside a long products mill

25% more capacity.12,000+ bundles.Every one accounted for.

CareGo redesigned how this steel pipe and tube mill stored, located, moved and staged long products, creating more capacity, eliminating sling and chain product damage, and getting outbound material ready before trucks needed it.

  • Capacity

    +25%

    increase in total product capacity

  • Traceability

    12,000+

    bundles tracked at capacity

  • Product protection

    Eliminated

    damage from traditional slings and chains

  • Flow

    Staged ahead

    of outbound trucks, improving turnaround

1. The challenge

Long products.Complex to store.Hard to move.

With 20 foot tall cradles holding roughly a dozen bundles each, the mill faced multiple challenges:

  • Limited capacity due to operator access laneways
  • Bundles often buried, requiring digging
  • Product damage from slings and chains
  • Variable bundle locations and visibility
  • Trucks waiting for material

The obvious question:

Where can we put more tube?

The CareGo question:

How do we make 12,000+ bundles easier to store, find, move and ship?

2. The solution

Less space for laneways.More flow for the mill.

  1. Reduce

    operator laneways

  2. Create digging

    and staging zones

  3. Coordinate with

    TELIA

  4. Stage ahead

    of trucks

Before

Wide operator laneways limiting storage capacity
Wide operator utilized laneways limited storage capacity and flow.

WithCareGo

Reduced laneways with purpose built digging and staging zones
Reduced laneways, purpose built zones and TELIA coordination increased capacity and improved flow.

3. The results

Better capacity. Better protection. Better flow.

  • Capacity

    +25%

    total product capacity by shrinking operator utilized laneways.

  • Traceability

    12,000+

    at facility capacity. Every bundle. Every time.

  • Product protection

    Eliminated

    damage caused by traditional slings and chains with a magnetic lift.

  • Flow

    Staged ahead

    bundles staged with precise timing, significantly improving truck turnaround.

  • Efficiency

    Maintained

    mill efficiency and output while improving overall flow.

4. How CareGo did it

A complete long product flow strategy.

  • Magnetic lift

    Magnetic lift

    Replaced slings and chains to eliminate product damage and improve handling safety.

  • TELIA

    TELIA

    Tracks every bundle and coordinates storage, retrieval and movement in real time.

  • Digging zones

    Digging zones

    Make buried bundles accessible and keep retrievals efficient.

  • Staging zones

    Staging zones

    Prepare the right bundles ahead of trucks with precise timing.

  • Reduced lanes

    Reduced lanes

    Less space for operator movement means more space for product.

5. What this means for you

Different roles. Same impact.

  • Owner

    Increase the capability of your facility without adding space.

  • CEO

    Improve customer service and throughput while growing the business.

  • CFO

    Reduce hidden costs from damage, inefficiency and wasted capacity.

  • VP of Operations

    Coordinate storage, retrieval and staging for consistent flow.

  • Plant Manager

    Know where every bundle is and get the right material ready when you need it.

Want a result like this in your mill?

Tell us about your long product operation and what it needs to achieve.